{"id":16624,"date":"2020-01-20T11:42:47","date_gmt":"2020-01-20T10:42:47","guid":{"rendered":"https:\/\/www.zumagliniegallina.it\/portfolio_page\/san-filippos-garage\/"},"modified":"2023-12-22T10:01:37","modified_gmt":"2023-12-22T09:01:37","slug":"san-filippos-garage","status":"publish","type":"portfolio_page","link":"https:\/\/www.zumagliniegallina.it\/en\/portfolio_page\/san-filippos-garage\/","title":{"rendered":"San Filippo&#8217;s Garage"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row css_animation=&#8221;&#8221; row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;full_width&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221;][vc_column][vc_column_text]A 3-story underground garage has been built within the courtyard of the Congregation of St. Philip Neri Oratory. The project included the construction of a micropile berm on the perimeter and the execution of the excavation using the top-down method. The use of tie-rods was not possible because the courtyard is on three sides fronted by historic buildings.The earth-disposal operations were carried out through the use of a tower crane, having left appropriate holes in the roof slab to allow loading operations.<\/p>\n<p>Part of the courtyard is superficially occupied by two buildings: in order to excavate inside, the foundations of the facade were replaced with an out-of-thickness beam. In the excavation phase, temporary micropiles were used as the main structures, which were later replaced with the final vertical structures.<\/p>\n<p>A total of about 6,000 cubic meters of soil and gravel were extracted for a total depth of 10.45 m from ground level. Each basement floor consists of two half floors with a height difference of 135 cm between them, connected by a 450 cm wide communication ramp.<\/p>\n<p>On the three floors of the garage, 39 parking garages have been built.<\/p>\n<p>Also on the project was the total resurfacing of the surface courtyard in Luserna blocks and the restoration of the congregation&#8217;s facades as directed by the Superintendent&#8217;s Office.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A 3-story underground garage has been built within the courtyard of the Congregation of St. Philip Neri Oratory.<\/p>\n","protected":false},"author":2,"featured_media":16226,"menu_order":120,"comment_status":"closed","ping_status":"closed","template":"","portfolio_category":[130],"portfolio_tag":[],"class_list":["post-16624","portfolio_page","type-portfolio_page","status-publish","has-post-thumbnail","hentry","portfolio_category-garages"],"_links":{"self":[{"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/portfolio_page\/16624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/portfolio_page"}],"about":[{"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/types\/portfolio_page"}],"author":[{"embeddable":true,"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/comments?post=16624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/media\/16226"}],"wp:attachment":[{"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/media?parent=16624"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/portfolio_category?post=16624"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/www.zumagliniegallina.it\/en\/wp-json\/wp\/v2\/portfolio_tag?post=16624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}